Kingsbury breaks 'water' on Mad River withdrawal improvements
Friday, October 14, 2022
Section: AGC/VT News




Vermont Business Magazine- Kingsbury Companies “Broke Water” on a project in Warren, Vermont earlier this summer installing an inflatable dam on the Mad River. The new dam replaces an existing dam owned and operated by Sugarbush Mountain Resort Inc., supporting seasonal snowmaking operations at Lincoln Peak, that has reached its design life and has been damaged by large storms in the past.

The new dam includes modern automated controls assuring water flows support the aquatic life in the Mad River both up and downstream of the location; as well as automatically lowering during periods of high flow to allow for natural stream flows. Kingsbury Companies expects to complete this project by the winter season.

Public Relations and Communications Manager for Sugarbush John Bleh said, “Sugarbush anticipates that the new dam will help provide a much more reliable process for withdrawing water, maintaining the snowmaking pond during the snowmaking season and protecting the river year-round.”

Kingsbury is a General Contractor that has extensive capabilities ranging from small local site development projects, to septic pumping and maintenance, to large-scale commercial dam reconstruction and everything in between. Kingsbury is a local company who has spread its reaches beyond New England & New York and continue to be pioneers in the construction industry for all of their services. At Kingsbury, their priority is Integrity, Adaptability, and Efficiency and they strive to achieve this in every project and for every client.  Connect with Kingsbury at www.kingsburyco.com(link is external).

Source: 
https://vermontbiz.com/news/2022/october/12/kingsbury-breaks-water%C2%A0-mad-river-withdrawal-improvements